Note: It will take more than 90 minutes to complete this lab. You should expect to only finish 2-3 of the modules during your time.  The modules are independent of each other so you can start at the beginning of any module and proceed from there. You can use the Table of Contents to access any module of your choosing.

The Table of Contents can be accessed in the upper right-hand corner of the Lab Manual.

See how you can gain insights into your infrastructure costs and compare the costs of running workloads in your private cloud with running them in select public clouds. Also learn how you can optimize compute resource utilization and improve planning and forecasting. In this lab, we will demonstrate how vRealize Operations and vRealize Business for Cloud improve operational efficiency by increasing capacity utilization and resource reclamation, allowing for better consumption tracking and visibility into the cost of resources, and streamlining capacity planning and forecasting.

Lab Module List:

Module 1 - Business alignment with insights into infrastructure costs for private cloud (60 minutes) (Basic)

This module covers the steps of using real-time reporting data from vRealize Business for Cloud (vRBC) to make meaningful decisions on running your business efficiently.  In this module, we will experience how vRealize Business for Cloud compares the cost of public and private cloud options, as well as the underlying cost drivers of each option.  You will also interact with the solution by redefining prices and observing how these changes impact the cloud cost. At the end of this module you will be able to leverage the information vRBC provides to make fact-based decisions regarding your data center.

Module 2 - Cost transparency and comparison of costs across private and public clouds (30 minutes) (Basic)

You can gain insights into your infrastructure and compare the costs of running workloads in your private cloud versus select public clouds. You can also optimize compute resource utilization and improve planning and forecasting. vRealize Operations and vRealize Business for Cloud improve operational efficiency by increasing capacity utilization and resource reclamation. Experience better consumption tracking, visibility into the cost of resources, and streamlined capacity planning and forecasting.

Module 3 - Capacity management: Alerting, reclamation, right sizing, capacity trending, costing, and capacity correlation (60 minutes) (Basic)

In this module, we will identify objects which are experiencing health issues or are at risk of running out of resources. Using alerts and analysis tools, vRealize Operations will indicate which virtual machines are stressed due to resource constraints and what procedure would be used to modify the constrained resource.  Generated alerts in vRealize Operations Manager appear in the alert lists. You use the alert lists to investigate, resolve, and begin troubleshooting problems in your environment.

Module 4 - vSphere capacity planning projects based on demand and consumption (30 minutes) (Basic)

Review any planned changes within the environment and understand how those  changes may impact capacity.  Create a project plan to understand the impact of adding additional resources and workloads.

Module 5 - Infrastructure compliance with vSphere, PCI and HIPAA Hardening Guides  (30 minutes) (Basic)

In this module you will learn how to ensure compliance of a vSphere environment and how to define a compliance standard for custom standards.  You will also ensure that host objects comply with alert-based compliance rules and how to customize a policy to enable vSphere Hardening Guide alerts.  Also you will investigate how industry standard compliances like PCI and HIPPA can be used to monitor a vSphere environment.

Lab Captains:

 

This lab manual can be downloaded from the Hands-on Labs Document site found here:

http://docs.hol.vmware.com 

This lab may be available in other languages.  To set your language preference and have a localized manual deployed with your lab, you may utilize this document to help guide you through the process:

http://docs.hol.vmware.com/announcements/nee-default-language.pdf


 

Location of the Main Console

 

  1. The area in the RED box contains the Main Console.  The Lab Manual is on the tab to the Right of the Main Console.
  2. A particular lab may have additional consoles found on separate tabs in the upper left. You will be directed to open another specific console if needed.
  3. Your lab starts with 90 minutes on the timer.  The lab can not be saved.  All your work must be done during the lab session.  But you can click the EXTEND to increase your time.  If you are at a VMware event, you can extend your lab time twice, for up to 30 minutes.  Each click gives you an additional 15 minutes.  Outside of VMware events, you can extend your lab time up to 9 hours and 30 minutes. Each click gives you an additional hour.

 

 

Alternate Methods of Keyboard Data Entry

During this module, you will input text into the Main Console. Besides directly typing it in, there are two very helpful methods of entering data which make it easier to enter complex data.

 

 

Click and Drag Lab Manual Content Into Console Active Window

You can also click and drag text and Command Line Interface (CLI) commands directly from the Lab Manual into the active window in the Main Console.  

 

 

Accessing the Online International Keyboard

 

You can also use the Online International Keyboard found in the Main Console.

  1. Click on the Keyboard Icon found on the Windows Quick Launch Task Bar.

 

 

Activation Prompt or Watermark

 

When you first start your lab, you may notice a watermark on the desktop indicating that Windows is not activated.  

One of the major benefits of virtualization is that virtual machines can be moved and run on any platform.  The Hands-on Labs utilizes this benefit and we are able to run the labs out of multiple datacenters.  However, these datacenters may not have identical processors, which triggers a Microsoft activation check through the Internet.

Rest assured, VMware and the Hands-on Labs are in full compliance with Microsoft licensing requirements.  The lab that you are using is a self-contained pod and does not have full access to the Internet, which is required for Windows to verify the activation.  Without full access to the Internet, this automated process fails and you see this watermark.

This cosmetic issue has no effect on your lab.  

 

 

Look at the lower right portion of the screen

 

Please check to see that your lab is finished all the startup routines and is ready for you to start. If you see anything other than "Ready", please wait a few minutes.  If after 5 minutes your lab has not changed to "Ready", please ask for assistance.

 

Module 1 - Business alignment with insights into infrastructure costs for private cloud (60 mins)

Introduction to Business Alignment


This module covers the steps of using real-time reporting data from vRealize Business for Cloud (vRBC) to make meaningful decisions on running your business efficiently.

In this module, we will experience how in vRealize Business for Cloud we can understand and compare the cost of public and private cloud options, as well as the underlying cost drivers of each option.

You will also interact with the solution by redefining prices and observing how these changes impact the cloud cost. At the end of this module you will be able to leverage the information vRBC provides to make fact-based decisions regarding your data center.


vRealize Suite - Cloud Management Platform (CMP)


There are several VMware bundles and editions that make up the vRealize Suite

Here is the complete set of products available

The infrastructure components we will focus on for this lab are...


 

vRealize Suite - More Details

 

What is the vRealize Suite?

VMware vRealize Suite is a cloud management platform purpose-built for the hybrid cloud. It provides a comprehensive management stack for IT services on vSphere and other hypervisors, physical infrastructure and external clouds, all with a unified management experience.

The vRealize Suite is targeted at customers who are interested in managing a significant amount of resources residing outside of the vSphere environment, including other virtualization platforms as well as public cloud computing platforms.

 

 

vRealize Operations Manager

 

vRealize Operations is available in three standalone editions.

The per CPU licensing refers to licensing on a per host basis.  The 25 pack licensing model refers to VMs and OSIs (operating system instances, in the case of physical servers and endpoints being managed/monitored).  

The 25 pack licensing model would require that the customer purchase additional licenses (25 pack) when they expand their environment beyond their current licensing.

 

 

vRealize Business for Cloud

 

vRealize Business for Cloud is available in two editions, Standard and Advanced.  

 

Costs, Metering and Consumption


In this module we will understand private cloud expenses along with IT cost metering and consumption.


 

Start the Firefox Browser

 

  1. Click on the "Firefox icon" in the System tray to start the browser window.

 

 

 

  1. Click the link "vRealize Operations Manager - Live Instance"

 

 

Log In

 

Login with the following credentials.  

Note that vRealize Business for Cloud (vRBC) now has UI integration with vRealize Operations Manager (vROPS) and uses the integrated Identity Manager to authenticate.

  1. Select VMware Identity Manager from the drop down.
  2. Select Redirect

 

 

Main Dashboards

 

The Overview dashboard provides Business Insight, Cloud Operations and Cloud Planning.

  1. Select Home Button
  2. Click on Business Management
  3. Select Launchpad

 

 

Gain Screen Space in vRealize Operations

 

  1. Open the Firefox menu found in the upper right hand corner.  
  2. Click the "-" twice to set the display to 80%.  This will provide you more viewing space while still allowing you to read the text.

 

 

Private Cloud (vSphere)

 

Let's explore the Private Cloud (vSphere) - Expenses section.

  1. Click on Private Cloud (vSphere) menu item.

 

 

Understanding the Expenses Overview Dashboard

 

Private Cloud (vSphere) is a dashboard in which the expenses are categorized into Hardware, Storage on Demand, Licensing, Maintenance, Labor, Network, Facilities, and Additional Costs.

We can modify tracked expenses for our data center. These costs can be in terms of percentage value or unit rate; they might not always be in terms of the overall cost.  Based on our inputs, the final amount of expenses is calculated. If we do not provide inputs regarding expenses, the default values are taken from the reference database.

Private Cloud (vSphere) displays projected cost of private cloud for the current month and the trend of total cost over time. For all the expenses, vRealize Business for Cloud displays the monthly trend of the cost variations, the actual expense, and a chart that represents the actual expense and the reference cost of the expense.

  1. Scroll down to see all of the Private Cloud expenses categories.

We can manually edit monthly cost of all the eight expense types from the current month onwards.

  1. Click on Edit Expenses icon to edit the monthly cost per category.

 

 

Edit Expenses

 

Using the Hardware tab as an example, we can view, add, edit, or delete the cost of each server group, based on their configuration and the purchase date of a batch server running in our cloud environment. After we update the server hardware cost, vRealize Business for Cloud updates the total monthly cost and average monthly cost for each server group.

We can modify the costs over all 8 categories. The Hardware group is just an example.

For purpose of this module, we will not make changes to any of the default costs.

Let's move forward and understand the showback area.  

  1. Click on Back to Expenses.

 

 

Consumption: Showback

 

Showback consists of providing IT management with an analysis of the IT costs due to each department without actually cross-charging those costs.

Let's explore vRBC Showback.

  1. Expand Showback

 

 

Showback Statement

 

  1. Click on Showback Statement.

The Showback Statement provides information about the business units and services, the projected monthly charge, and budget values for our environment.

We can define a business unit through vCenter, vRealize Automation, or vCloud Director Instances as vRBC Connections.

Monthly Budget:  Displays the total monthly budget for the month along with charge projection.

Month to Date Charge:  Displays the total charge value for the months.

Projected Monthly Charge:  Displays the monthly charge values.

Private Cloud Reclamation:  Displays the charge on oversized, powered off and idle virtual machines. This information is based on vRealize Operations Manager and vRealize Automation integration which helps to identify the amount of resources that can be reclaimed and provisioned to other objects in our environment or amount of potential savings that can be done in each month.

We can click on each value to see information about which virtual machines are related to the specific charge and know the recommendations to make the best use of the resources.

Let's see more detail information about Idle VM:

  1. Click on $ value for Idle VMs.

Note: The value amounts here could be different than your lab.

 

 

Showback Statement: Idle VMs - Savings Report

 

  1. Here we can see all the potential reclaimable virtual machines that are idle.

 

 

Data Center Optimization

 

vRBC provides visibility into each of the data centers to visualize the cost of used and remaining capacity of the data centers. The cost is calculated based on the percentage values collected from vRealize Operations Manager. The cost is classified into compute cost and storage cost.

  1. Scroll the bar to see all options.
  2. Expand the What-If Analysis and Click on Data Center Optimization.

 

 

Data Center Optimization Area

 

We can see the Used Capacity and Remaining Capacity costs per data center and Compute, Storage, and Labor Costs of each data center. The data can be used to help you understand and optimize the data center utilization.

  1. Mouse over on the data center diagram to see more details about the Used Capacity.

 

Module Conclusion


You have completed Module 1:  Business alignment with insights into infrastructure costs for Private Cloud

You should now have an understanding of:  

Proceed to the next module


 

Evaluate vRealize Suite Standard

Would you like to see how vRealize Suite Standard could help better manager your applications and infrastructure?  Request a free 60-day evaluation here to try it out in your own environment.

 

 

How to End Lab

 

If you wish to conclude your lab at this time click on the END button.  This will terminate your lab and all progress.  Do this only if you wish to NOT proceed with the other modules.

 

Module 2 - Cost transparency and comparison of costs across private and public clouds (30 mins)

Navigation Basics in vRealize Business for Cloud


In this module you will learn how to navigate the vRBC web interface


 

Check the Lab is Ready

 

Before we start this next section, please first check the lab is Ready.

If it is not, you may need to wait a few minutes until the status shows the lab is Ready.

 

 

Open Firefox Browser from Windows Quick Launch Task Bar

 

  1. Click on the Firefox Icon on the Windows Quick Launch Task Bar.

 

 

Select Live vRealize Operations Manager

 

  1. Click the "vRealize Operations Manager - Live Instance" link.

 

 

Log In

 

vRealize Operations is integrated with VMware Identity Manager which we will use for this lab.  

One of the major reasons for the change to vIDM is not only the reduced footprint and ability to easily scale, it’s also the added functionality.  vIDM now brings a slew of new features, including:

In addition, the vIDM identity stack supports many authentication protocols and methods (some of which were previously not supported):

  1. Click the drop down and select "VMware Identity Manager"
  2. Click "REDIRECT"

 

 

Identity Manager Authentication

 

Be sure to login with the correct user account.

  1. Userid = hol and Password = VMware1!
  2. Use the correct domain of CORP.LOCAL.  If you need to change the domain select that option
  3. Select Sign In

 

 

 

 

Business Management Home Page

 

Navigate to vRealize Business Management Overview Dashboard.

  1. Select Home Tab
  2. Click on Business Management
  3. Select Overview

The vRealize Business for Cloud,  Business Management screen has been designed to be consistent with the vSphere Web Client to make for a familiar experience.

This Overview page yields high level information across the entire environment, which will show us operational and costing information.

 

 

Set Browser Zoom Level

 

The lab environment has a default resolution of 1024x768.  To minimize the need for extensive scrolling within the vRealize user interface, please adjust the zoom level in Firefox.    

  1. Open the Firefox Menu drop down.
  2. Set the desired zoom level.  Typically 80-90% is sufficient to provide adequate screen space for your lab environment.  Also making use of the full-screen option is recommended.

 

 

Status of Capacity and Infrastructure Utilization

 

Here we are looking more closely at the Operational Information included on the Overview page.

  1. Total number of VMs and how they are distributed across Clouds.
  2. Capacity status at a Datacenter level.
  3. Utilization status at a Datacenter level.

Note:  Since the HOL runs in an isolated environment your numbers may vary but we have included a similar screenshot within vRealize Business for Cloud.  

 

 

Understand the Total Cost of the Cloud Infrastructure

 

Here we are looking more closely at the Costing Information included on the Overview page.

  1. Total cost of VMs and how those costs are distributed across Clouds.
  2. Cost breakdown by Business Unit.
  3. Cost vs Price trend information.

Note:  Since the HOL runs in an isolated environment your numbers may vary but we have included a similar screenshot within vRealize Business for Cloud.  

 

 

Expenses - Private Cloud (vSphere)

 

Under Expenses notice that we have the option to look at expenses incurred by our Private Cloud.  If we click on Private Cloud (vSphere) under Expenses, we can see costing information as it relates to our vSphere environment.   If we scroll down on the page, we can see more detailed costing information with Cost Drivers broken down by resource.

 

 

Operational Analysis - Private Cloud (vSphere)

 

We can also look at Operational Expenses in our Private Cloud environment.  If we click on Private Cloud (vSphere) under Operational Analysis,  can see operational information broken down by resource.  If we expand the dropdown box for 3 Servers, we can see additional host details.  

 

 

Navigate to Private Cloud Consumption

 

We can also look at Private Cloud Costing information.  Click on Pricing and Charges under Consumption.

 

 

Private Cloud Pricing and Charges

 

Navigate to the Pricing and Charges page.  Here we can view Pricing, Charges, and Business Unit information for our Private Cloud.

  1. Select Pricing and Charges, Pricing  

 

 

Comparing Private and Public Cloud Costs

 

Lets take a look at Cloud Comparison.  Example:  Lets compare a group of VM's to plan our Private Cloud costs and compare those costs to Amazon Web Services and Microsoft Azure pricing.  

  1. Select What-If Analysis, Migration

 

 

Comparing Private and Public Cloud Costs...continued

 

 Next step you will need to select your vm's to do a costs comparison.

  1. Select Import VM's (not shown)
  2. Click on "Select All"
  3. Click on Done

The system will now show you details for your Private Cloud (vSphere), Amazon Web Services, and Microsoft Azure

 

 

Navigate to Reports

 

Reporting is available in vRealize Business for Cloud also.  Simply scroll down to the Report section and click on the desired report.  It will generate the report in PDF format for you to download.

 

Cloud Comparison


vRealize Business not only helps companies better understand the cost of their private cloud offerings, it also helps compare those costs to similarly configured offerings available from public cloud vendors like Amazon Web Services or Microsoft Azure. With this information, administrators can make more confident decisions about when to leverage public cloud resources versus delivering services internally.


 

Cloud Comparison

 

  1. Navigate to the Home, Launchpad
  2. Select Cloud Comparison.

 

 

Cloud Comparison

 

The screen capture shows a sample comparison of  virtual machines between your Private Cloud, AWS and Amazon Web Services.

Note: The numeric values may be different in your lab from what is shown in the screenshot.

 

 

Edit VM Group

 

Let compare a specific set of vm's from the Human Resources business unit.

Click on Import VM's (not shown)

  1. Select Human Resources, Select All
  2. Click on Done.

 

 

Compare VMs on Different Cloud Providers

 

Note: The value amounts here could be different than your lab.

  1. Select Manage Cloud Providers.

 

 

Manage Cloud Providers

 

Cloud providers can be added by drag and dropping them into the comparison section.

  1. Click on VMC and drop it onto Microsoft Azure to have it replaced.
  2. Click on Done to review the information

 

 

Compare Data Centers

 

We can compare the costs of multiple data centers in the same fashion.  This can help you determine which data center to deploy our virtual machine(s) into.  You can do so by selecting Manage Data Centers but note that this lab environment has limited resources so you will only see one DC.

You have reached the end of the module, please close any open web browsers.

 

Module Conclusion


You have completed "Module 2 - Cost transparency and comparison of costs across private and public clouds." You should now be familiar with comparing cloud instance costs and utilization within vRealize Business for Cloud.

Proceed to any module below which interests you most.


 

Evaluate vRealize Suite Standard

Would you like to see how vRealize Suite Standard could help better manager your applications and infrastructure?  Request a free 60-day evaluation here to try it out in your own environment.

 

 

How to End Lab

 

If you wish to conclude your lab at this time click on the END button.  This will terminate your lab and all progress.  Do this only if you wish to NOT proceed with the other modules.

 

Module 3 - Capacity Management: Alerting, Reclamation, Right Sizing, Capacity Trending, Costing, and Capacity Correlation (60 mins)

Introduction to Capacity at Risk


In this module, we will identify objects which are experiencing health issues or are at risk of running out of resources. Using alerts and analysis tools, vRealize Operations will indicate which virtual machines are stressed due to resource constraints and what procedure would be used to modify the constrained resource.  Generated alerts in vRealize Operations Manager appear in the alert lists. You use the alert lists to investigate, resolve, and begin troubleshooting problems in your environment.

In this scenario, you will investigate and resolve a virtual machine which has unexpected high memory usage causing an alert.  We will first describe the main badges which appear on the Summary screen.


 

Health Badge - Immediate Issues

 

The Health widget is the status of the health-related alerts for the objects it is configured to monitor in vRealize Operations Manager. Health alerts usually require immediate attention. You can create one or more Health widgets for different objects that you add to your custom dashboards.

 

 

Risk Badge - Future Issues

 

The Risk widget is the status of the risk-related alerts for the objects it is configured to monitor. Risk alerts in vRealize Operations Manager usually indicate that you should investigate problems in the near future.

 

 

Efficiency Badge - Optimization Opportunities

 

The Efficiency widget is the status of the efficiency-related alerts for the objects it is configured to monitor. Efficiency alerts in vRealize Operations Manager usually indicate that you can reclaim resources. You can create one or more Efficiency widgets for objects that you add to your custom dashboards.

 

 

Alerts

 

The Alerts list is all the alerts generated in vRealize Operations Manager. The alerts notify you when a problem occurs in your environment. You use the alert list to determine the state of your environment and to begin resolving the problems.  There can be alerts pertaining to Health, Risk or Efficiency.  In this example we note a VM that has generated an alert (Risk Badge) for high memory usage.

 

 

Alerts - Details

 

1. Select the Alert name for detailed information

 

 

Alerts - Details continued

 

  1. The Alert Information will show you when the alert was triggered and if it is still active.
  2. It will also show you what triggered the condition.  In this case it was memory stress above 50%.
  3. The Run Action button will show you what actions you can take to resolve the problem.

 

Workload Balancing and Placement


Within a virtualized environment, even with the best planning, the distribution of the workloads between hosts, clusters and data centers can get out of balance. Being out of balance itself is not a problem as long each workload can obtain the resources it needs without causing contention. Contention exists when the workload on a specific host requests more resources than are available.  Resource contention is one of the most critical issues in any virtualized environment.  When contention occurs, applications slow down and your users are affected.  

Distributed Resource Scheduler (DRS) is a proven vSphere feature that moves virtual machines (VMs) within a cluster (between hosts) to ensure virtual machines are always running on a host with adequate resources to support it.

vRealize Operations Manager can move virtual machines between clusters to ensure the clusters are balanced in the environment, which in the end helps DRS.  vRealize Operations Manager's Rebalance Container action allows you to balance workloads between the clusters in your data center or custom data centers by providing you move recommendations.  These move recommendations come in the form of a rebalance action plan.  The plan lists move recommendations and provides a reason on why to move it (CPU or memory imbalance).

Up until now two different methodologies have been employed to mitigate the risk of contention, with varied results.  New to vRealize Operations and vSphere is Predictive DRS, a capability that can be used to minimize resource contention proactively.  Predictive DRS uses a combination of DRS and vRealize Operations Manager to predict future demand and determine when and where hot spots will occur.  When future hot spots are found, Predictive DRS moves the workloads before contention occurs.


 

Launch the HVM vRealize Operations Manager Console

 

 

Workload Rebalancing

In the following steps and video, you will learn how to remediate a cluster based resource constraint by rebalancing virtual machines between clusters using the Rebalance Container Action.

Note: It is important to balance between clusters configured for workloads of similar priority or importance to your organization.

For example, you would not want to balance workloads in a test/dev environment with your production, mission critical applications; this could cause unexpected behavior within the production environment.

Due to the significant amount of resources required to simulate an out of balanced cluster, which would negativity affect the lab as a whole, we have chosen to walk you through how to access the Workload Balancing within vRealize Operations Manager.

 

 

Predictive DRS

 

Resource contention is one of the most critical issues in any  virtualized environment.  When contention occurs, applications slow down  and your users are affected.  Up until now two different methodologies  have been employed to mitigate the risk of contention, with varied  results.  But now I want to introduce you to the new “game changing”  method available from VMware: Predictive DRS

How does Predictive DRS work?  It starts by leveraging one of the core functions of vRealize Operations, Dynamic Thresholds, which understand the behaviors of all workloads throughout the day. vRealize Operations Manager collects hundreds of metrics across numerous types of objects (hosts, datastores, virtual machines, and other objects) every day.  Each night vRealize Operations Manager runs Dynamic Threshold calculations using sophisticated analytics to create a band of what is “normal” for each metric/object combination.  The band has an upper and lower bound of normal for each metric associated with object.  For example, if there is a simple application server virtual machine, vRealize Operations Manager will show the virtual machine does not use a lot of CPU early in the morning.  However, at 8 AM, when people start logging into the system, the CPU load will spike very high.  It will then taper off around noon as people go to lunch, and then back up again for the rest of the day until people go home.  And don’t forget about the nightly reports which run at 2AM and spike CPU.

The great thing about Dynamic Thresholds is that they are tailored to each individual virtual machine and application.  There is nothing you need to do; the analytical engine in vRealize Operations takes care of everything.

Once vRealize Operations Manager has calculated its Dynamic Thresholds we have 3 fundamental data points:

Once we have those we can ask the most important contention mitigation question of all, “Will any of my hosts struggle to serve my workloads today”?  If the answer is “Yes” then let’s move a few virtual machines around to avoid that future contentious situation.  In a nutshell, this is how Predictive DRS works.   

 

 

Finding Resources to Reclaim


In this course we will use vRealize Operations Manager to determine if there are resources that can be reclaimed in the environment.


 

Launch the HVM vRealize Operations Manager Console

 

 

Search for Cluster

 

In this module we are going to focus on the cluster named lab-clus1. This cluster has the potential to have virtual machines that are sized inappropriately for their workload. While examining the cluster for potentially resizing virtual machines to reclaim compute capacity, we will also be looking for old snapshots in the cluster and idle or powered off virtual machines.

  1. In the Search Bar on the upper right corner, type lab-auto and hit Enter.

 

 

Cluster Summary

 

You are transitioned to the Summary tab for lab-auto.  This view provides details on the configuration, performance, utilization and any alert conditions triggered.  Summary is a great place to determine the status of an object and associated child objects.    

  1. Click the More icon to display All Metrics for lab-auto cluster.

 

 

Analysis Tab

 

1. Select the Analysis tab.

Your view will transition to the Workload badge.  The Workload badge is often the first place to look when determining whether to reclaim capacity.  Although the badge is primarily focused on demand or consumption over the past 5 minutes, it does provide a quick view into overall activity and whether the object is a possible candidate for right-sizing.  Remember the goal for right-sizing an environment is improving efficiency to maximize the financial investment in infrastructure resources.  

2.  Additionally you can look at Workload Trend over the past 180 days to help you understand overall utilization of configured resources for the cluster.  

3.  Let's drill down deeper...To examine reclaimable capacity recommendations, click Reclaimable Capacity tab.

 

 

Identify Reclaimable Cluster Capacity

 

In the Reclaimable Capacity Breakdown panel you can see that CPU, memory and disk space are available to be reclaimed.  These resources have already been allocated to virtual machines, but vRealize Operations Manager has found that they are not being used efficiently.  Inefficient usage occurs when:

  1. In this cluster, we can see that there is available memory from Oversized and Idle virtual machines.  We can reclaim this memory by resizing or removing the vms's.   So, where do we start?
  2. Click the Virtual Machine Reclaimable Capacity link under Further Analysis section.  

Note:  Virtual Machine Reclaimable Capacity is an example of a vROPS View.  Views are the basic building block of a report.  Aside from the Analysis tab and reports, Views can also be added to dashboards.  Views are an excellent way to provide relevant information in an easily digestible format.  

 

 

Identify Reclaimable Virtual Machine Capacity

 

This view provides more information about the virtual machines that have reclaimable resources.  Scroll to the bottom.  Now we can see what virtual machines may have extra CPU, memory and\or storage along with the Total Reclaimable Waste.  We can also see if there are old snapshots of the virtual machine and the Power State.

General Recommendations:

 

 

View Virtual Machine Reclaimable Capacity

 

Let's focus on finding virtual machines with overprovisioned CPU.

  1. Scroll and find ops-1001 vm

We now see that ops-1001 may be overprovisioned on CPU by 2 vCPUs.  Lets view more detailed information about the vm's CPU usage and talk to the server/application owner before taking any action.  This data is a great starting point for a resource conversation.  It is important to keep in mind that the reclaimable resources do not take into account operating system and application minimum configuration requirements.    

Let's gather a few more details for that conversation.

2.     Click on the ops-1001 virtual machine link.

 

 

Navigate to Virtual Machine

 

  1. The link will redirect you to the virtual machine ops-1001 (top left corner)
  2. Select the Analysis.

 

 

Review Virtual Machine Reclaimable Capacity

 

  1. Make sure the Reclaimable Capacity tab is selected.
  2. Now we can see that not only is this virtual machine oversized for memory, but also CPU and disk space.  This should give us sufficient information to either take action or discuss resizing the virtual machine with the server/application owner.

 

 

Old Snapshots

 

Let's go back and review the Reclaimable Capacity report to identify old Snapshot Data.  In this case, we will check a cluster for old snapshots.

  1. In the Search Bar on the upper right corner, type lab-ops and hit Enter.

 

 

Old Snapshots...continued

 

We are back to the Virtual Machine Reclaimable Capacity view that we were previously reviewing.  It lists the virtual machines which reside within this cluster.  Let's sort the columns by Old Snapshot.

  1. Click on the Analysis
  2. Click on the Reclaimable Capacity tab
  3. Select Virtual Machine Reclaimable Capacity View/Report

Note:  Your VM information may differ slightly from the screenshot.

 

 

Reclaimable Capacity Report - Old Snapshots

 

  1. Now we are seeing virtual machines which reside on this cluster.  Let's sort the data of Old Snapshot by double clicking the column.
  2. VM's IIS-WEBAPP1 and VRA-WIN2K12-T2 should have their snapshots cleaned up to recover diskspace and prevent performance issues.

 

 

Powered Off Virtual Machines

 

From the same report we can also identify virtual machines that are powered off.

  1. Double click the Power State column and scroll through the list.  There are many virtual machines that are assigned resources and are no longer in use and may be deleted.

You have reached the end of the module, please close any open web browsers.

 

Module Conclusion


You have completed Module 3 - Capacity Management: Alerting, Reclamation, Right Sizing, Capacity Trending, Costing, and Capacity Correlation.

You should now have an understanding of:  

 

Feel free to proceed to any module below which interests you most:

Module 4 - vSphere capacity planning projects based on demand and consumption

Module 5 - Compliance of infrastructure with the vSphere hardening guide


 

Evaluate vRealize Suite Standard

Would you like to see how vRealize Suite Standard could help better manager your applications and infrastructure?  Request a free 60-day evaluation here or scan the QR-Code to try it out in your own environment.

 

 

How to End Lab

 

If you wish to conclude your lab at this time click on the END button.  This will terminate your lab and all progress.  Do this only if you wish to NOT proceed with the other modules.

 

Module 4 - vSphere capacity planning projects based on demand and consumption (30 mins)

Introduction to Capacity Planning


vRealize Operations Manager not only alerts on potential resource  constraints before they become a problem, it also allows you to review  any planned changes within theenvironment and understand how those  changes may impact capacity.

Capacityplanning also provides a way to "lock in" planned project  capacity so that it will beconsidered in capacity analysis.In some  cases, new hardware or additional capacitymay be required and the  projects within capacity planning can be designed to considerthose  situations as well.

In this module, we will be guided through creating a capacity project  to understand theimpact of adding additional resources and workloads.


Demand and Consumption Analysis



 

If already in vRealize Operations - Historical Instance(HVM)

 

  1. If you are already logged into the vRealize Operations - Historical Instance(HVM), click the Home tab and skip to the Search for Virtual Machine win-apptier3 step. Otherwise, please proceed to the next step.

 

 

Open Firefox Browser from Windows Quick Launch TaskBar

 

  1. Click on the Firefox Icon on the Windows Quick Launch Task Bar.

 

 

Log In to vRealize Operations Manager - if prompted

 

  1. If prompted,Login to vRealize Operations Manager with the following credentials:
  2. Click the Login button.
User name: Admin

Password: VMware1!

 

 

Set Browser Zoom Level

 

The lab environment has a default resolution of 1024x768.To minimize the need forextensive scrolling within the vRealize Operations user interface, please adjust the zoomlevel in Firefox.

  1. Open theFirefox Menu drop down.
  2. Set the desired zoom level.Typically 80-90% is sufficient to provide adequate screen space for vRealize Operations in the lab environment.Also making use ofthe full-screen option is recommended.

 

 

Gray Health Status

 

Occasionally the vRealize Operations Historical Instance (HVM) does not initiatalize properly in a lab environment.If you see a gray circle in the Home Dashboard, navigate to the desktop. Otherwise, skip the Restart HVM Services Script step.

 

 

Restart HVM Services Script

 

 

Search for Virtual Machine win-apptier4

 

We will now explore the option of adding new hardware to mitigate the capacity risk we identified previously with lab-clus1 and the associated child hosts and virtual machines.We will take into consideration additional demand.

1.   Click on the search Icon on the top right of the screen.

 

 

2.  In the Search bar, type win-apptier4.

3.  Click the virtual machine win-apptier4 to view the details for this virtual machine.

 

 

Show the All Metrics

 

1.  Click on All Metrics menu option for win-apptier4.

 

 

Review the CPU Metric

 

For the All Metrics Options you can see all metrics related to the selected object.

You can see the CPU | Ready (%) is in yellow, that means there is some anormaly for this metric. Let's to analyze this metric...

1.    Expand the CPU tree.

2.    Double click on CPU | Usage (%).

3.    You may analyze the CPU behavior on the timeline and check when the CPU hits 100%.

This may help you to understand changes or new installations on the VM and start the issue troubleshooting.

Let's see review the Alerts for this Virtual Machine and check the impacts for this Alert.

 

 

Review the Alerts

 

1. Click on Summary tab for Alert Review.

We can now see risk alerts on the virtual machine win-app-tier4.

Virtual Machine has continuous high CPU usage causing stress

  1. Click the more... tab to show more tab options.

 

 

Review the Virtual Machine Environment

 

  1. On the Environment tab, scroll down to review the health of the objects related to win-apptier4. Stop scrolling when you can see Cluster Compute Resource and Host System.

For the most part, things look healthy, however we know the virtual machine win-apptier4 is  likely experiencing CPU Stress due to an application or OS  condition.

Let's take a look at this cluster and the associated hosts again.

2.   Notice the default Badge for this screen is the Health Badge. So the Object status colors here are associated to the Health Badge.

3.   Hover over the green, highlighted Host System (the only host not grayed out). This is the parent host for win-apptier4.

4.   Notice the Time Remaining and Capacity Remaining are "Critical" for this host.

 

 

 

Badge Risk Changing

 

As we identifying there is a Risk issue for the Hosts, we may change the Badge Status for Risk, and then understand where are the risks for our Datacenter.

1.   Click on the Capacity Remaining Badge for Badge color Status changing.

2.   Hover over the red, highlighted Host System (the only host not grayed out). This is the parent host for win-apptier4.

3.   Notice the Time Remaining and Capacity Remaining keep "Critical" for this host.

Let's do the same for Compute Resource Cluster...

 

 

Analyze Cluster Health

 

For this step we will look at the resources for lab-ops. We mentioned that there was risk for a capacity shortfall. Over the next few steps, you will walk through how to  address that situation.

  1. Hover over the red highlighted Cluster Compute Resource.
  2. Notice Time and Capacity Remaining are Critical.
  3. Click the highlighted red Cluster Compute Resource badgefor lab-ops to drill into the cluster details. Occasionally a second double-click is  required. If the double click does not take you to the details for lab-ops, use the search function in the title bar of the user interface. Be sure to select the item from Cluster Compute Resource.

 

Planning Capacity Changes



 

Drill Into Cluster Details

 

  1. After double-clicking on the cluster badge, you should now be viewing the lab-ops cluster details;

Even  though the health-related badges are green, they represent the state of  the host or cluster at this point in time. As we have seen, Time Remaining is identifying future risk. How many new hosts should we add to deal  with this constraint? What will happen if we add another virtual machine  to the cluster? Over the next several steps, we will create a new  project to add capacity and demand in order to answer these questions.

2.   Click the Projects tab.

 

 

 

Create a New Project

 

Projects help users model their planning ideas.

  1. By default, the Projects tab  will display the most constrained capacity container to help you decide  what types of projects you will need to create. In this case, Memory Consumed is the most constrained;
  2. Click on the green plus icon to add a project.

 

 

 

Project Creation

 

A planned project can be used to understand how changes will impact the capacity forecast.

A committed project  will impact the capacity analysis and can be used to "lock in"  resources for a project until the changes are implemented. With a  committed project you can ensure that project resources will be  available.

  1. (Optional) Click on the maximize icon to get a better view;
  2. Enter Add Capacity and VM Demand as your project name;
  3. Set Status to Planned;
  4. Click Scenarios.

Note: Setting the Status to Committed  changes how Capacity Remaining and Time Remaining are calculated for  this object. Changes will be reflected on the Projects graph and the  Capacity Remaining and Time Remaining tabs.

 

 

Add Capacity Scenario

 

You can create many scenarios within a project, first we will create additional capacity by adding a host.

  1. Double click or drag add Host System to the scenario workspace;

We can now specify the scenario details, such as Scenario Name, Scenario Description, Implementation Time and Date and the specifics of the changes.

2.   Set the Implementation Date to two weeks from today;

You  can either define the host configuration yourself, or even better you  can use an existing host system as a model for your scenario.

3.   Increase the number of hosts to 3;

4.   Click the Populate metrics from button.

 

 

 

Copy Host Configuration from Another Host

 

  1. Use the drop down to display available hosts to copy metric values;
  2. Double-click w2-sm-c4b1-mgmt.local;
  3. Click OK (not shown).

 

 

 

Save Scenario

 

The capacity values for the new host are now pre-populated based on w2-sm-c4b1-mgmt.local. At this point, you are only adding a single host. How will this impact your Memory Consumption?

  1. Review the Metrics for the added capacity (you may need to scroll down);
  2. Click the Save project and continue editing button.

 

 

 

Change Date Displayed

 

Because this lab is using HVM (Historical View Mode), the data is  captured at a specific point in time. Depending on today's date and the  Implementation Date, you may or may not see your scenario in the graph  (as shown in the screenshot). In order to see your scenario update the  date range:

  1. Click the Date icon;
  2. Modify the Date Range;

From: <Today's Date>

To: <1 month out>

  1. Click Go.

 

 

 

Review Added Capacity Impact

 

  1. The Add Capacity scenario is now annotated on the trend line and you can see the impact on Memory Allocation.  Capacity now exceeds demand (hoove over the graph area after the project small green box), the graph no longer shows the red demand  trend line. In this project, three hosts will be enough to address the  capacity shortfall.

 

Next, we will model adding virtual  machines to the cluster before the new host is added. Projects allows  you to gauge the impact of adding demand to determine when additional  capacity is required. For this example, you can use the model to  determine how additional demand impacts the projected shortfall on the  cluster before and after a host is added.

 

 

Add Virtual Machine Scenario

 

  1. Double-click or drag add Virtual Machine to the scenario workspace;
  2. Set the Implementation Date to one week from today (make sure it is set to a date before the Add Capacity scenario);
  3. Click the Populate metrics from button.

 

 

 

Use Pre-Defined Virtual Machine Configuration

 

  1. For Copy metric values from a pre-defined profile, use the drop down arrow to select AVERAGE.
  2. Click OK.

 

 

 

Review Added Virtual Machine Impact

 

  1. Increase the number of VMs to 4;
  2. Scroll down to view the pre-populated values from the Average profile;
  3. Save project and continue editing;
  4. The Add Virtual Machine  scenario is now annotated on the trend line and you can see the impact  of both the additional virtual machines and added host capacity for Memory Allocation. Notice that we still have memory constraints when we add the new  virtual machines (1.2), but this constraint will be removed when the new  host is added (1.1);
  5. Click Save.

 

 

 

Add Project to Chart

 

Now that we have created the Add Capacity and VM Demand project, we will need to add the project to the chart bar to see the effect on resources in the chart.

You have the option to drag and drop or add the project.

  1. Drag and drop or click on the green circle plus icon to add the project to the chart.

The chart will update to reflect the project changes you modeled.

 

 

Review Chart with Project

 

Note:Multiple projects can be added to the chart at  the same time. Charting multiple projects is very useful for gaining a  better understanding of the total impact, as well as how the project  timing will influence resource availability. In this example, we  implemented the additional virtual machine demand before adding new  capacity.

Reminder: If you do not see your scenarios, you will need to modify the Date Range - See section "Change Date Displayed".

You have reached the end of the module, please close any open web browsers.

 

 

Conclusion


In this module you learned:


 

Congratulation on completing "Module 4 - vSphere capacity planning projects based on demand and consumption".

 

If you are looking for additional information on "Planning the Capacity for Your Managed Environment Using vRealize Operations Manager", try one of these:

Proceed to any module below which interests you most.

 

 

Evaluate vRealize Suite Standard

Would you like to see how vRealize Suite Standard could help better manager your applications and infrastructure?  Request a free 60-day evaluation here to try it out in your own environment!

 

 

How to End Lab

 

If you wish to conclude your lab at this time click on the END button. This will terminate your lab and all progress. Do this only if you wish to NOT proceed with the other modules.

 

Module 5 - Infrastructure compliance with vSphere, PCI and HIPAA Hardening Guides (30 mins)

Introduction to vSphere Compliance


Compliance is used to monitor the vCenter Server instances, hosts, virtual machines, distributed port groups, and distributed switches in your environment to ensure that the settings on your objects meet the defined standards.

vRealize Operations Manager includes alerts for VMware vSphere Hardening Guide versions 6.0 and 5.5. vRealize Operations Manager generates compliance alerts when symptoms trigger on your vCenter Server instances, hosts, virtual machines, distributed port groups, and distributed switches.

To enforce compliance on virtual machines, vRealize Operations Manager includes several compliance risk profiles. You apply the risk profiles to groups of virtual machines based on whether you must ensure a high, medium, or low level of security in your environment.

All the compliance standards in vRealize Operations Manager, including any standards that you define, are based on alert definitions.

You can find the vSphere Hardening Guides at http://www.vmware.com/security/hardening-guides.html.

In this module you will learn:


Ensuring compliance of vSphere 6.0 objects


As the virtual infrastructure administrator for your company, you must ensure that your vSphere 6.0 objects comply with the compliance rules in the vSphere Hardening Guide. You use the compliance alerts in vRealize Operations Manager to monitor your objects for violations to your compliance standards. When a compliance alert triggers on your vCenter Server instance, hosts, virtual machines, distributed port groups, or distributed switches, you investigate the compliance violation. You must resolve the violation so that the violated object continues to meet industry security standards.    

To enforce and report on the compliance of your vSphere 6.0 objects, you enable the compliance rules in the vSphere Hardening Guide. Then, you enable the appropriate alerts, and apply a risk profile to your virtual machines. After vRealize Operations Manager collects the compliance data from your objects, you resolve any rule violations that occurred, and create a report of the compliance results for your manager and the compliance team.

In this lesson you will learn:


 

Logging into vRealize Operation Manager

vRealize Operations Live Credentials
Server: vrops-01a
User: admin
Password: VMware1!

 

  1. Click on the Firefox icon in the Windows Taskbar;
  2. By default, the homepage should point to the lab links. Click on the "vRealize Operations Manager - Live Instance" link on the homepage or click on the icon in the bookmar toolbar;
  3. Log in with the user "Admin" and the password "VMware1!".

 

 

Enabling compliance rules in vRealize Operations

 

  1. Click on the "Administration" tab;
  2. Make sure the "Solutions" tab on the left menu is select, if not click on it to select;
  3. Click on the "VMware vSphere" solution to select it (you may have to scroll);
  4. Click on the "Configure" icon;
  5. In the "Manage Solution" dialog box, click "DEFINE MONITORING GOALS".
  6. On the "Define Monitoring Goals" window scroll all the way down and select "Yes" for "Enable vSphere Hardening Guide Alerts";
  7. Click "SAVE" and a success confirmation pop-up should appear (not shown). Click OK;
  8. Back in the "Manage Solution" window click on the "SAVE SETTINGS" button;
  9. Click on the "CLOSE" button.

 

 

Enabling compliance alert definitions in the default policy

 

  1. Click on the "Administration" tab;
  2. Click on the tab "Policies" in the left menu;
  3. Click on the "Policy Library" tab;
  4. Click on the "Default Policy" from the list;
  5. Click on the "Edit Selected Policy" icon;
  6. In the "Edit Monitoring Policy" window click on the "Alert / Symptom Definitions" in the left menu;
  7. In the filter box type "hardening" and hit ENTER;
  8. From the "Alert Definitions" window select "vCenter is violating VMware vSphere Hardening Guide" (you may have to scroll down or adjust the columns size);
  9. On the column "State" choose "Local" with the green check mark and click on the SAVE button (not shown).

 

 

Viewing the symptom set in the alert definition

 

  1. Click on the "Alerts" tab;
  2. Expand the "Alert Settings" tab and click "Alert Definitions" in the left menu;
  3. In the filter box type "hardening" and hit ENTER;
  4. Click on the "vCenter is violating vSphere Hardening Guide" from the list (you may have to scroll);
  5. In the lower pane, locate the alert "Impact", "Criticality", and "Symptoms" set (you may have to scroll);
  6. Scroll through the symptom set and examine the symptoms, which can trigger an alert, for the host (you may have to scroll);
  7. Below the symptom set, examine the "Recommendation" to fix the problem if this alert triggers on your host (you may have to scroll);
  8. You could click the link to the "VMware vSphere Hardening Guide" and a Web paeg would open to the list of "VMware vSphere Security Hardening Guides" at http://www.vmware.com/security/hardening-guides.html but since we do not have Internet access the page will not load (you may have to scroll).

 

 

Running a compliance report on a vCenter Server instance

 

Define a compliance standard for custom standards


As a virtual infrastructure administrator, you are responsible for the vCenter Server instances, hosts, virtual machines, distributed port groups, and distributed switches in your environment. To ensure the compliance of your vSphere objects, you create a compliance standard based on an alert definition. In vRealize Operations Manager, you can configure an alert definition to use as a compliance standard. When you create an alert definition as a compliance standard, you add all the relevant symptom definitions to the alert definition. Each symptom is a rule in the compliance standards. For most alert definitions, you must avoid adding too many symptoms to the alert definition.

vRealize Operations Manager includes alerts for VMware vSphere Hardening Guide versions 6.0 and 5.5.

You can find the vSphere Hardening Guides at http://www.vmware.com/security/hardening-guides.html.

In this scenario, the alert notifies you when SSH is not running on the host.

In this module you learn:


 

Configure Basic Information for the Host Compliance Standard

If you are not logged in vRrealize Operations live instance please get back to Logging into vRealize Operation Manager before proceed.

To create an alert definition that is also a compliance standard, you first configure the name, base object type, and the alert impact.    

The name of the alert is the name of the standard on the Compliance tab.

 

Infrastructure Compliance with PCI DSS 3.2 and HIPAA Standards


The PCI (Payment Card Industry) Security Standards addresses the growing threat to consumer payment information. Companies and organizations that accept, process, or receive payments should adopt it as soon as possible to prevent, detect and respond to the cyber attacks that can lead to breaches. The vRealize Operations compliance pack for PCI provides Alerts, Policies, and Reports to validate the vSphere resources against the PCI DSS 3.2 standards.

HIPAA (Health Insurance Portability and Accountability Act of 1996) provides data privacy and security provisions for safeguarding the medical information. The vRealize Operations Compliance Pack for HIPAA provides Alerts, Policies, and Reports to validate the vSphere resources against the HIPAA standards.

The configurations of the following resources are validated using this content:

In this lesson you will learn:


 

Enabling the vRealize Operations Compliance Alerts

Note that the vRealize Operations Compliance Packs for PCI DSS and HIPAA have already been installed in this lab. By default, the compliance alerts are not enabled in any polices so you will need to enable the alerts the vRealize Operations Manager policy(ies). The alerts will drive the compliance reports, views and dashboards within vRealize Operations. Typically, organizations that are subject to PCI or HIPAA regulations will have specific environments within their enterprises where they are handling the credit card information or patient data. In that case, they would want to add only the infrastrucre that will be suject to the regulations into groups within vRealize Operations Manager and then enable the compliance alerts only for those groups.

In this lab environment, all infrastructure uses the policy named "Hands On Lab Policy" so we will enable the compliance alerts for that policy.

 

 

Running the PCI DSS and HIPAA Non-compliance Reports for vSphere objects

Now that the alerts are enabled, we can run the non-compliant reports to see which conditions are out of compliance.

 

 

Review PCI and HIPAA Alerts

In addition to non-compliance reports, vRealize Operations manager also includes alerts to notify users when infrastructure objects are out of compliance with the standards. These are the alerts that we enabled in the policy at the beginning of this section and are what drives the reports and the compliance dashboard (which we will review next).

 

 

Non-Compliance Results From the Object Perspective

While the reports and alerts are more global in scope, vRealize Operations Manager also lists non-compliance issues in a couple of places for each object when the compliance packs are installed.

 

Conclusion


In this module we learned :


 

Congratulation on completing "Compliance of infrastructure with the vSphere Hardening Guide, PCI and HIPAA"

 

If you are looking for additional information on "Compliance of infrastructure with the vSphere Hardening Guide, PCI and HIPAA", try one of these:

Proceed to any other lab module below which interests you most.

 

 

 

Evaluate vRealize Suite Standard

Would you like to see how vRealize Suite Standard could help better manager your applications and infrastructure?  Request a free 60-day evaluation here to try it out in your own environment.

 

 

How to End Lab

 

If you wish to conclude your lab at this time click on the END button. This will terminate your lab and all progress. Do this only if you wish to NOT proceed with the other modules.

 

Conclusion

Thank you for participating in the VMware Hands-on Labs. Be sure to visit http://hol.vmware.com/ to continue your lab experience online.